TerraMine

Early game. Rates can change. USD cash-out is not live.

Manual mode

Bring in your mine stats—without the spreadsheet work.

Keep this calculator and TerraMine My Mines open. The extension syncs visible, non-identifying totals and exact production levels when My Mines loads or refreshes.

No copy, paste, or Apply button. It never sends a password, token, mine name, ID, or location. Your goal, boost commitment, TB pace, and level target stay under your control.

  1. 01
    Open both tabsKeep this calculator open, then open TerraMine My Mines—not the general Dashboard.
  2. 02
    Let My Mines finish loadingThe extension reads visible mine types and exact production-level counts. No extension click is needed.
  3. 03
    Look for “Exact mine levels synced”Refresh My Mines whenever your portfolio changes. Your planning choices are never overwritten.

What do you want to make per day?

Choose the boost time and production level you can realistically maintain. The calculator works backward from there.

Manual plan
Your portfolio at this boost plan$0.000000 / day0 mines at their actual production levels

Mines already above level 3 keep their actual levels. New mines start at level 1, so each path includes the work to bring them to your chosen minimum.

Boost plan vs. goal

0 boosted hours per day
Per day$0.000000Goal $0.0100
Per week$0.000000Goal $0.0700
Per month$0.000000Goal $0.3000
Per year$0.000000Goal $3.65

Choose the work you can actually do.

Planning example

Claim-focused

$0.0100 / day
New mines
4,922
TB still needed
492,200 TB
Production-level floor
Level 1
Production-level steps
0
Claim runway
Add your TB pace
0 exact current-mine steps + 0 future-mine steps to keep this path's level-1 floor.
Planning example

Upgrade-heavy

$0.0100 / day
New mines
3,394
TB still needed
339,400 TB
Production-level floor
Level 10
Production-level steps
30,546
Claim runway
Add your TB pace
0 exact current-mine steps + 30,546 future-mine steps to keep this path's level-10 floor.

Balanced example: claim 4,474 mines and plan 8,948 concrete production-level steps while maintaining 0 boosted hours per day.

First upgrade queue

0 production-level steps

Every current mine is already at or above your level 3 minimum.

Material quantities are not guessed. TerraMine does not currently expose a reliable complete upgrade-cost table. This queue can calculate earnings impact and production-level work, but not promise a material total or finish date.

This is a planning estimate. Exact synced production levels are used instead of averages. Visible type-and-level rates are used only when TerraMine identifies them as unboosted; otherwise the model falls back to the current observed Rock level-one rate, official type multipliers, and a clearly disclosed 5% level assumption. Rates can change and displayed USD is not guaranteed cash-out.

See every assumption